The overall assignment can be categorised into the following five tasks: 1: Baseline study of the solid waste sector; 2: Project proposal; 3: Environmental and social appraisal; 4: Institutional reform proposal; and, 5: Financial and economic analysis. Based on the topographical data, will prepare either: (1) detailed design for rehabilitation and upgrading of existing dumpsites, including: – 3D topographical model of the dumpsite; – Design of embankments protecting the dumpsites from the erosion by the river (if any) and insulating the waste; – Design (if feasible) of a draining system for the leachate collection; – Design (if feasible) of a network of biogas collection; – Cover of the dumpsites. (2) detailed design for the new landfill/other waste management option in the proposed site Estimate either: (1) the volume of waste to be removed and the associated costs of such a removal; or (2) costs for the construction of the landfill/another waste management option and for the equipment. |