KULOB SOLID WASTE PROJECT – FEASIBILITY STUDY (FUNDED BY EBRD)

01.05.2015 – 31.10.2015

Tajikistan

Name of Client:
EBRD
Approximate Contract Value (in USD or EUR):
EUR 280 000
Assignment Name and Brief Description of Main Deliverables or Outputs

The overall assignment can be categorised into the following five tasks:
1: Baseline study of the solid waste sector;
2: Project proposal;
3: Environmental and social appraisal;
4: Institutional reform proposal; and,
5: Financial and economic analysis.
Based on the topographical data, will prepare either:
(1) detailed design for rehabilitation and upgrading of existing dumpsites, including:
– 3D topographical model of the dumpsite;
– Design of embankments protecting the dumpsites from the erosion by the river (if any) and insulating the waste;
– Design (if feasible) of a draining system for the leachate collection;
– Design (if feasible) of a network of biogas collection;
– Cover of the dumpsites.
(2) detailed design for the new landfill/other waste management option in the proposed site.

Estimate either: (1) the volume of waste to be removed and the associated costs of such a removal; or (2) costs for the construction of the landfill/another waste management option and for the equipment.