01.11.2006 – 31.05.2007
Tajikistan
Name of Client: |
ADB |
Approximate Contract Value (in USD or EUR): |
USD 500 000 |
Assignment Name and Brief Description of Main Deliverables or Outputs |
The main outcome of the TA was an agreed design for the proposed project based on a comprehensive flood risk management approach embracing both structural and nonstructural measures. The specific outputs of the TA were (i) assessment of immediate flood risks and identification of cost-effective flood protection works that could be immediately implemented; (ii) development of a long-term comprehensive flood risk management plan for the project area encompassing effective structural and nonstructural measures for flood preparedness and flood response strategies; and (iii) formulation of a comprehensive investment proposal for flood risk management project, covering an appropriate portion of the period addressed by the plan in (ii), consistent with ADB’s safeguard and sector policies. Description of actual services provided by your organization: |