01.02.2019 – 31.05.2021
Tajikistan
Name of Client: |
WB |
Approximate Contract Value (in USD or EUR): |
USD 648 000 |
Assignment Name and Brief Description of Main Deliverables or Outputs |
The project will build a cross-border power trade facility, comprising about 475 km of 500kV HVAC transmission lines to carry power from Kyrgyz Republic to Tajikistan at Khujand; a 1300 MW HVDC converter in Tajikistan (at Sangtuda) and thereafter a 750km long ±500kV HVDC transmission link via a 300 MW HVDC converter in Kabul, to a 1,300 MW terminal with HVDC converter facilities in Pakistan. The AC to DC convertor station would be designed to help power trade in any direction and would offer significant emergency system support to the national grids of the countries connected through HVDC system. The services of an Owner’s Engineer (the Project Consultant) are required for the implementation phase of the CASA-1000 Project for the 25 km 500 KV HVAC Transmission Line (from border of Kyrgyz Republic to Khujand) traversing the territories of Kyrgyz Republic and Tajikistan. Inside the territory of Tajikistan, a 500KV HVAC transmission line from Regar to Sangtuda is also included (total length 115 km) in the scope of services. The Project Consultant will assist implementing agency of HVAC sections of the CASA-1000 project in construction supervision, support for project implementation, audit and TA. Specifically, the Consultant’s support would be needed in the design, construction supervision and commissioning of the 500 KV HVAC line and substations). |